Segregated Production Area

Building: Modified Event Structure
Dimensions: 10m Span / 15m Long / 2.4m Eave Height
Cladding: Steel
Roof: Single Skin

THE REQUIREMENT

Our client, a manufacturer of laminate products, required the maintenance of a high temperature during one stage of production for a particular item. Heating the entire production area to this temperature would have been highly impractical, extremely expensive, and very uncomfortable for their employees. A segregated area was the best solution, though something purpose built would be not only expensive, but difficult to move, whilst a traditional marquee structure would not provide the longevity or rigidity the client wanted.

OUR SOLUTION

Our solution was to utilise one of our event marquee structures using 5m bays, the 10 x 15m unit pictured slotting neatly into the area already demarcated within the factory. Rather than canvas sides, we gave the client the rigid and more aesthetically appealing structure they wanted by using trapezoidal steel cladding. Finally, to allow easy access for both personnel and materials on pump trucks, whilst maintaining correct temperature and letting in plenty of light, we installed made-to-measure medium gauge transparent strip curtains in both central side bays.

Condis Supermarkets has found in you the temporary solution we needed to address the problem of lack of space that has adversely impacted part of our logistic activity over the course of works to extend our automatic warehouse. You completed the installation and start-up quickly and easily.

Miguel Merlos, Condis SupermarketsHead of Reverse Logistics

We have not received a single warning about incidents with the tent at maintenance level since its installation. As far as maintenance is concerned, there is nothing to highlight ... which is a good sign. It is solid, resilient and versatile.

M. Gómez & J. Silva RACKS