Despatch Tunnel

Building: The Roder S-Line Classic
Dimensions: 12.5m Span / 25m Long / 5m Eave Height
Cladding: Steel
Roof: Single Skin

THE REQUIREMENT

Our client, a flooring manufacturer, had plenty of loading space, but it was all exposed to the elements, risking damage to their product and obliging warehouse staff to endure bad weather whilst loading finished product in all seasons.

We needed to create a large loading bay, open at both ends – since the site is secure – for ease of access by both forklift, van, and occasionally HGV. This structure had to be as close to the existing despatch door as possible, whilst avoiding blocking HGV access to the process tanks adjacent and the building overhang above.

OUR SOLUTION

With its 2.5m span increments and 5m eave height, our S-line classic proved the ideal solution. Following the gentle slope of the loading ramp for 25m, its sides clad in trapezoidal steel to keep out wind and rain, the structure you see here will provide decades of loading space for our happy client – out of the weather.

Condis Supermarkets has found in you the temporary solution we needed to address the problem of lack of space that has adversely impacted part of our logistic activity over the course of works to extend our automatic warehouse. You completed the installation and start-up quickly and easily.

Miguel Merlos, Condis SupermarketsHead of Reverse Logistics

We have not received a single warning about incidents with the tent at maintenance level since its installation. As far as maintenance is concerned, there is nothing to highlight ... which is a good sign. It is solid, resilient and versatile.

M. Gómez & J. Silva RACKS

Want to know more?